pm-gantt-chart

ASCII Gantt chart renderer for pm-cli

安装

已安装 pm 时

pm install npm:pm-gantt-chart --project

使用 npm,无需安装 pm

npx -y @unbrained/pm-cli install npm:pm-gantt-chart --project

使用 Bun,无需安装 pm

bunx @unbrained/pm-cli install npm:pm-gantt-chart --project

README

Gantt chart renderer for pm-cli with ASCII, SVG, HTML and Mermaid exports, dependency-aware scheduling and Triplicate styling.

Renders your pm items as a week-by-week timeline in the terminal — grouped by milestone, sprint, release, assignee, status, type, or tag — and exports the same chart to Mermaid gantt, standalone HTML, ASCII, a CSV schedule, or structured JSON. Can compute and highlight the critical path (longest dependency chain), and run dependency-aware scheduling that derives each item's start/end from its blocked-by chain plus estimates.

Example output

pm gantt  •  8 weeks from 2026-06-01  •  critical path marked
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
GROUP               ITEM                       S  W1      W2      W3      W4      W5      W6      W7      W8
──────────────────────────────────────────────────────────────────────────────────────────
                                                  Jun  1  Jun  8  Jun 15  Jun 22  Jun 29  Jul  6  Jul 13  Jul 20
──────────────────────────────────────────────────────────────────────────────────────────
S1                  *Build endpoint           ▶   ▓▓      ▓▓
                    *Design API               ✓   ▓▓
S2                  *Release                   ○   ▓▓      ▓▓      ▓▓      ▓▓
                    Write docs                ○   ░░      ░░      ░░
                    *Integration tests        ○   ▓▓      ▓▓      ▓▓
(no milestone)      Backlog grooming          ○   ░░      ░░
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Legend: ██ in_progress/blocked  ░░ open/planned  ▓▓ critical-path (*)  ·· undated  S: ▶in_progress  !blocked  ✓closed  ○open

Installation

Requires pm CLI 2026.10.20 or newer for locked scenario-selection guards. Development and CI use the exact SDK pin declared in package.json; the consumer floor is independently exercised by packed npm acceptance.

In a plain project directory, initialize a tracker and activate the published package:

npx -y @unbrained/[email protected] init --defaults --agent-guidance skip
npx -y @unbrained/[email protected] install npm:[email protected] --project

With Bun:

bunx @unbrained/[email protected] init --defaults --agent-guidance skip
bunx @unbrained/[email protected] install npm:[email protected] --project

Use the explicit npm: source: an owner/repository shorthand is interpreted as a local path, not as a registry package.

Without git

Rendering, scheduling and chart exports work with a plain-directory tracker; no git repository or git executable is required. GitHub sync and changelog commands based on tags need a git repository and their separate tools.

Usage

Terminal chart — pm gantt

# Default: 8 weeks, grouped by milestone, all statuses
pm gantt

# Show 12 weeks
pm gantt --weeks 12

# Group by sprint / release / assignee / status / type
pm gantt --group-by sprint
pm gantt --group-by release
pm gantt --group-by assignee
pm gantt --group-by status

# Show only in-progress items
pm gantt --status in_progress

# Anchor the window at a specific date, or clip it with --to
pm gantt --from 2026-06-01 --weeks 16
pm gantt --from 2026-06-01 --to 2026-08-01

# Dependency-aware scheduling: derive start/end from blocked-by chains + estimates
pm gantt --schedule
pm gantt --schedule --default-duration 3

# Compute & mark the longest dependency chain
pm gantt --critical-path

# Show only the critical path (great paired with --schedule)
pm gantt --critical-only --schedule

# Show each item's % complete on its bar
pm gantt --progress
# (or use the --show-progress alias)
pm gantt --show-progress

# Overlay fixed release/deadline dates as labeled vertical markers
pm gantt --milestones "v1.0=2026-06-30,v1.1=2026-08-15"

Export — pm gantt export

# Mermaid `gantt` diagram (default format) to stdout. Use the global --quiet
# flag when piping so the CLI's command receipt is not appended to the artifact.
pm --quiet gantt export

# Mermaid to a file
pm gantt export --format mermaid --output roadmap.mmd

# Standalone, self-contained HTML
pm gantt export --format html --output roadmap.html

# Scalable Vector Graphic (SVG) — a self-contained vector render of the chart.
# Use --width to request the canvas width in pixels (default 1000, clamped 320..8192).
pm gantt export --format svg --width 1600 --output roadmap.svg

# Plain ASCII (the same chart `pm gantt` prints)
pm gantt export --format ascii --output roadmap.txt

# CSV schedule: id,title,start,end,duration_days,slack_days,deps,status,critical,progress_percent,overdue,off_window
pm gantt export --format csv --schedule --output schedule.csv

# Structured JSON schedule for agents / programmatic consumers
pm gantt export --format json --schedule --output schedule.json

# Export honors the same shaping flags (including --schedule / --critical-only)
pm gantt export --format html --group-by assignee --critical-path --weeks 12 --output team.html
pm gantt export --format mermaid --schedule --group-by sprint --output plan.mmd

The exporter writes to the file given by --output, or prints to stdout when omitted. For a clean pipe or redirect, invoke it as pm --quiet gantt export …; --quiet suppresses the CLI's trailing command receipt while retaining the exported artifact.

Options

Both pm gantt and pm gantt export accept the shaping flags:

Flag Values Default Description
--weeks <n> 1–52 8 Number of weeks to display (ignored when --to is set)
--group-by <field> milestone | sprint | release | type | assignee | status | tag milestone How to group items into rows
--status <filter> open | in_progress | blocked | closed | canceled | draft | all all Filter items by status
--from <iso> YYYY-MM-DD current week Anchor the chart window at this date
--to <iso> YYYY-MM-DD — Clip the window to end at this date (derives the week count, overriding --weeks)
--schedule flag off Dependency-aware scheduling: derive start/end from blocked-by chains + estimates
--default-duration <days> integer ≥ 1 5 Fallback duration for items with no estimate under --schedule
--critical-path flag off Compute & mark the longest dependency chain
--critical-only flag off Show only items on the critical path (implies critical-path computation)
--progress flag off Show each item's % complete on its bar
--show-progress flag off Alias for --progress — show each item's % complete on its bar
--width <px> integer ≥ 1 1000 Requested render width in pixels for SVG and HTML (clamped 320..8192; SVG expands when needed to preserve readable week columns; ignored by ASCII/Mermaid/CSV/JSON)
--milestones <list> name=YYYY-MM-DD,… — Draw fixed release/deadline dates as labeled vertical markers on the timeline

pm gantt export adds:

Flag Values Default Description
--format <fmt> mermaid | html | svg | ascii | csv | json mermaid Output format
--output <file> path stdout File to write (prints to stdout if omitted)

json emits the computed schedule as structured, machine-readable data — window, options, a summary (project span, critical-path length, total task-days, per-group workload), milestones, and an items[] array where each entry carries id, title, type, status, group, ISO start/end, durationDays, slackDays, progress, critical, overdue, infeasible, offWindow, and gating deps. Unlike pm --json gantt (which returns the rendered ASCII chart plus summary counts), this is the full per-item plan, so agents and scripts can reason about the schedule without parsing a chart or CSV. Output is deterministic (no embedded wall-clock), so identical input produces byte-identical JSON. Pair with --schedule for dependency-derived dates and slack.

csv emits a schedule table: id,title,start,end,duration_days,slack_days,deps,status,critical,progress_percent,overdue,off_window (deps = space-separated blocking ids). Pair it with --schedule for dependency-derived dates and slack. slack_days is the total float in days (only populated under --schedule; blank otherwise): 0 marks a critical-path item, a positive value is how many days the task can slip without delaying the project, and a negative value means the plan is already late for a downstream deadline. The trailing risk columns make the CSV useful directly in spreadsheets and portfolio reports: critical/overdue are yes/no, progress_percent is 0..100, and off_window distinguishes before, after, and undated rows.

svg emits a self-contained, scalable vector graphic of the chart — the same grouped rows, week columns, status-colored bars, critical-path highlighting, overdue markers, off-window hints, today rule, milestone diamonds, and --progress fill as the HTML render, but as resolution-independent SVG primitives. Use --width to request the canvas width in pixels (default 1000, clamped to 320..8192). For long timelines the SVG expands beyond that request rather than clipping the chart, preserving a readable 24px minimum per week. The output is a single <svg> document (with an <?xml?> prologue) suitable for embedding in docs, slides, or websites, or for rendering at any zoom level without pixelation.

Slack / float, critical path & infeasible deadlines

Under --schedule, a backward pass (classic CPM) computes each item's latest feasible start/finish from the project end and any downstream deadlines, then derives total slack = latest start − earliest start:

  • 0 slack → the item is on the critical path; any slip delays the project.
  • positive slack → the item can slip that many days harmlessly.
  • negative slack → the item's required start (to hit a downstream deadline) is before its earliest feasible start. The plan is already late. These items are listed in a WARNING: block on stderr by both pm gantt and pm gantt export, and flagged per-task in the JSON result (tasks[].slack_days, tasks[].infeasible, plus infeasibleCount / warnings).

Minimal deadline repair proposals

pm gantt repair evaluates explicit changes for a fixed deadline. It returns the fewest moves that make every retained active item feasible under the existing forward/backward scheduler, including each item's own deadline. Repair feasibility uses earliest starts rather than the chart's just-in-time deadline placement: waiting until a later deadline must not create a need for extra capacity. Closed/canceled prerequisites count as satisfied. It never writes items, estimates, deadlines, dependencies, or plan decisions.

pm gantt repair --from 2026-10-21 --deadline 2026-10-22 \
  --capacity task-a=960 --defer task-b --forbid task-release --json

Only named offers are considered: --capacity id=minutesPerDay,... supplies dedicated daily capacity for estimated work (baseline 480 minutes/day; offers 481..4800), and --defer id,... allows those exact items to leave this scenario. No retained item may depend on deferred work. --forbid id,... overrides both. Capacity availability is a caller-supplied assumption; this is a precedence and calendar-day model, without shared-resource contention, weekends, or holidays.

Output uses the host's compact TOON by default or JSON with --json. Each proposal includes exact moves, affectedIds (moved items plus items whose dates change), recomputed finish/retainedCount, deferredMinutes, and addedMinutesPerDay. Titles, bodies and full schedules are omitted. minimalChanges is minimum move count within the explicit vocabulary; ties prefer less deferred effort, then less added daily capacity, then stable move order. totalProposals and truncated describe output limiting.

Bounds: 200 corpus items, 2000 ordering edges, 24 effective offers, 1..3 moves (--max-changes, default 3), 1..10 results (--max-proposals, default 5), and 1..10000 evaluations (--max-evaluations, default 5000). Missing estimates use --default-duration (default 5 calendar days, 1..365); they cannot receive a capacity offer. Estimates must be zero or finite values from one second (1/60 minute) through 175200 minutes. Cycles, missing prerequisites, malformed dates, invalid offers, oversized scenarios, exhausted search and unavailable repairs return typed refusals with code, message, remedy (CLI exit 2). Search exhaustion never presents an uncertified minimum. An already feasible scenario returns zero changes and no proposals. Full ISO tracker deadlines are accepted; CLI scenario days require real YYYY-MM-DD values.

The typed SDK exports proposeDeadlineRepairs(items, options, graph?) and DeadlineRepairOptions, DeadlineRepairResult, DeadlineRepairProposal, DeadlineRepairMove, DeadlineCapacityShift, DeadlineRepairRefusalCode. Pass a complete dependency-closed corpus. The optional graph uses the existing PrerequisiteGraph contract for custom registry ordering; the CLI resolves workspace registrations automatically. Core plan decision can record a chosen proposal after review. See the worked example.

Without git

Rendering, scheduling, exports, duration calibration, uncertainty intervals and deadline repair proposals work in plain trackers without git installed. This package's runtime commands do not require a git repository. Repository release/changelog tooling needs git history.

Forecast and calibration APIs share one strict duration input contract. Malformed estimates, sampling controls, calibration controls and native effort fields return invalid_estimate with remedies before numerical work. Sparse arrays, nonfinite numbers, negative zero, invalid dates and extra keys in closed objects are refused.

Successful calibration and forecast results pass a numeric/date output contract before SDK return or CLI serialization. Invalid computed fields return invalid_estimate naming the field; ratios are never emitted as Infinity or null. See the documented domain and output ranges.

Observed-duration calibration

pm gantt calibrate --type Task --minimum-samples 10 --json compares elapsed calendar minutes with planned effort at verified start, for an exact task class and optional --tag. Default output is compact TOON. Canceled, reopened, incomplete and unverifiable histories are disclosed; too few usable episodes returns a typed refusal with remedies and no numerical calibration.

The typed SDK calibrateObservedDurations(pmRoot, options) returns deterministic nearest-rank quantiles, complete sample counts, bounded diagnostics and an explicit {kind: "empirical", values: [...]} duration population. Callers can choose to pass it to completionIntervals with minutesPerDay: 1440 for calendar time. Estimates stay unchanged; elapsed time includes waits and makes no causal productivity claim. See the worked SDK/CLI example and evidence rules.

Schedule drift explanations

pm gantt snapshot --scenarios resources.json --json > before.json saves one explicit resource alternative. Capture a second snapshot after reviewed changes, then run pm gantt drift --before before.json --after after.json --limit 20 (append --json for JSON; default TOON). The existing resource engine replays estimates, calendars, shared owner capacity and prerequisites. Each moved goal has its exact civil-day delta, individual counterfactual witnesses and causal routes; unchanged finishes collapse to snapshot/id references. Missing inputs, unknown status roles and unsupported changes remain gaps with remedies. Complete saved snapshots replay through a 16 MiB file transport, with a shared 4 MiB canonical JSON budget enforced by capture and validation. Calendar names including constructor and __proto__ remain ordinary own entries.

SDK: captureScheduleScenario, validateScheduleSnapshot, explainScheduleDrift and exported snapshot/result types. These operations are read-only and work without git. See the worked example and limits and public tracker measurements.

Resource-constrained schedule scenarios

pm gantt resources --scenarios resources.json compares explicitly named alternatives with shared assignee capacity, weekday/holiday calendars and daily, weekly and total minute limits. It returns bounded TOON (default) or --json, per-item computed dates, numerical owner overload witnesses, counts and revision receipts. Existing item dates stay unchanged. Calendar days use an explicit IANA time zone and reproduce across host zones and daylight-saving weekends.

Explicit --select, --selection, --expect-revision, --target and --target-revision record a feasible reviewed snapshot as a core note through the SDK's journaled mutation and locked target revision check. Source changes require recomputation. The allocator is a deterministic heuristic; exhaustion without a capacity witness does not prove global infeasibility. Missing effort or capacity refuses with a typed remedy. The typed SDK exports resourceScenarios, applyResourceSelection and their calendar, alternative, result, refusal and selection types. Everything works without git. See the worked example, bounds and selection semantics.

Effort and external waiting

pm gantt waiting --waits waits.json previews declared external waits separately from native estimated effort. Default output is compact TOON; append --json for JSON. A task with 120 minutes of effort and a 2880-minute external wait consumes 120 capacity minutes and spans 3000 elapsed minutes in the continuous-minute model. Previews preserve ownership, claims and all native data.

{"waits":{"project-task":{"minMinutes":2880,"maxMinutes":2880}},"limit":20}

Bounds omitted inside a declared wait stay null (unknown), including downstream completion bounds. An absent declaration means zero declared wait, not evidence that a task has no real-world delays. Counts and total effort cover the complete scope; limit bounds only returned rows. Configured SDK status roles and ordering relationships govern the projection. Use pm next for core readiness and gantt resources for shared owner calendars/capacity. This preview models one serial wait after effort, with unlimited parallel effort and elapsed minute offsets; it does not forecast calendar dates or manage reservations/reminders.

The typed SDK exports effortWaitingPreview for an already certified corpus and previewEffortWaiting for a fresh SDK read. Both use the same strict boundary and finite output contract. See the worked SDK/CLI example and refusal remedies.

Completion intervals for agent plans

pm gantt uncertainty samples declared effort uncertainty over the existing registry-aware prerequisite graph. Pass a JSON map of active item ids to bounded minute ranges ([480,2400]), uniform distributions ({"kind":"uniform","min":480,"max":2400}), triangular distributions ({"kind":"triangular","min":480,"mode":960,"max":2400}), or fixed points ({"kind":"point","minutes":960}). Unchanged recorded estimates are fixed points; missing estimates and every dependent completion remain unknown.

pm gantt uncertainty --from 2026-10-22 --seed 42 --estimates estimates.json
pm gantt uncertainty --from 2026-10-22 --seed 42 --estimates estimates.json --json

Compact TOON (default) and JSON include project/per-item completion quantiles, unknown counts, a sensitivity ranking and a complete scenario receipt. Defaults are 2000 samples, probabilities 0.1/0.5/0.9, 480 effort minutes per calendar day and 20 output rows. Override with --samples, --quantiles, --minutes-per-day, and --limit. Quantile finishes are exclusive UTC instants; continuous durations do not round up to whole days like the bar renderer. Independent effort draws, unlimited parallel capacity and no holidays/resource contention are explicit assumptions. Deadlines and creation dates do not postpone earliest starts. This evaluates declared uncertainty and trains no model.

The receipt retains the algorithm version, unsigned 32-bit seed, resolved inputs, normalized dependencies, controls, assumptions and SHA-256 input hash. Output limits bound item/sensitivity rows while retaining all receipt inputs; counts and truncated expose omissions. An unknown project finish suppresses project quantiles and sensitivity. Otherwise dominantEstimate identifies the largest absolute Pearson correlation between a sampled estimate and project finish. This is linear association, not causal variance attribution; constants return zero correlation. Monte Carlo quantiles and sensitivity are approximate.

Bounds: 200 corpus items, 2000 ordering edges, 100..10000 samples, at most 5,000,000 sample × (item + edge) operations, 1..200 output rows and 1..9 strictly increasing probabilities in [0,1]. Effort is finite, ordered and within zero or 1/60..175200 minutes; effort per day is 1..1440. --estimates must be a regular JSON object file no larger than 64 KiB. Cycles, missing prerequisites, invalid inputs and exceeded bounds return typed code, message, remedy refusals (exit 2). The command does not mutate tracker documents or write the receipt implicitly.

The typed SDK exports completionIntervals(items, options, graph?), CompletionIntervalOptions, CompletionIntervalResult, UncertainEstimate, CompletionScenarioReceipt and related quantile/refusal types. It reuses the SDK execution kernel and the package's registry-aware graph adapter. Supply a complete dependency-closed corpus; the CLI certifies its full read and resolves custom workspace ordering automatically. See the worked example and receipt replay.

Preflight data-sanity gate

Before rendering, both pm gantt and pm gantt export run a preflight data-sanity gate so bad data surfaces early instead of producing a silently-confusing chart. It splits problems into two tiers:

  • Hard-fail (blocks, non-zero exit) — a dependency cycle. A cycle has no valid topological order, so dependency-aware scheduling is impossible and any chart drawn from it would be plausible-looking but wrong. The command aborts with a clear error naming the full cycle path, e.g.:

    gantt: 1 fatal data problem(s) make scheduling impossible:
      • dependency cycle: pm-a "Design" → pm-b "Build" → pm-a "Design"
    Resolve the dependency cycle(s) above and re-run.
    
  • Warn (non-blocking, stderr; chart still renders, exit 0) — soft issues that still yield a useful chart: a deadline that precedes the item's own start date, and an implausibly large estimate (over ~2000h, almost always a minutes-vs-hours unit error). These print a NOTE: block on stderr and are suppressed under --json to keep machine-readable output clean.

Fully valid data produces no warnings and no block. (Infeasible/unreachable downstream deadlines are a separate, lighter signal — they are flagged in the schedule's backward pass rather than by this gate; see above.)

TODAY marker (all formats)

The current week is indicated in every format, shown only when "today" falls inside the chart window:

  • ASCII — a ▼TODAY caret under the week column that contains the current date.
  • Mermaid — a %% today: <date> comment.
  • HTML — the matching week column is highlighted with a red vertical rule and a ▼ today label in the header.

--milestones — fixed release/deadline dates

Items are scheduled work; milestones are immovable calendar targets (a release, a launch, a contractual deadline). In cross-functional views that aren't grouped by milestone, those dates are otherwise invisible. --milestones overlays them as labeled vertical markers so deadline pressure is obvious at a glance.

Pass a comma-separated list of name=YYYY-MM-DD entries:

pm gantt --milestones "v1.0=2026-06-30,v1.1=2026-08-15"
  • ASCII — a ▼<name> caret in the week column the milestone lands in (parity with the ▼TODAY marker). Multiple milestones in the same week are comma-joined (▼v1.0,beta).
  • Mermaid — a dedicated section Milestones with native zero-duration :milestone markers on the exact date, so they render as the diamond marker.
  • CSV — appended rows (id=milestone:<name>, status=milestone, start=end=date) so the dates round-trip alongside the schedule.

Milestones outside the rendered window are ignored on the chart/Mermaid output, with a one-line note on stderr (CSV still includes them so the data round-trips). Malformed entries (missing =, empty name, or a non-ISO date) fail cleanly with a usage error rather than crashing. The same flag is honored by pm gantt export.

--progress — % complete on bars

--progress (opt-in) renders each item's completion ratio on its bar. The ratio is derived deterministically from available pm signals:

  • closed / canceled → 100%
  • an explicit meta.progress / meta.percent_complete number (a 0..1 fraction or a 0..100 percent) → honored verbatim
  • an acceptance-criteria checklist in the body (- [x] vs - [ ]) → checked / total
  • in_progress with no other signal → 50% (a "halfway" default); blocked → 25%
  • everything else (open / draft) → 0%

It surfaces as a trailing NN% plus a coarse fill glyph in ASCII (·· 0% · ░░ 25% · ▓░ 50% · ▓▓ 75% · ██ 100%), as a %% tN progress: comment in Mermaid (the diagram has no native per-task percent field), as a width-sized fill overlay plus a NN% label in HTML, and as progress_percent in CSV.

Overdue / deadline-risk highlighting

Items whose deadline is before today and that are not closed/canceled are flagged automatically (no flag needed):

  • ASCII — a trailing ‼ OVERDUE marker on the row.
  • Mermaid — the task carries the crit tag (the diagram's deadline-risk styling) plus an %% overdue: comment.
  • HTML — the bar gets a red striped fill, the due date turns red, and the row label shows a ‼ overdue marker.

Overdue items are also counted in the JSON result (overdueCount, overdue[]) and listed in a NOTE: block on stderr (suppressed under --json).

Off-window vs. undated items

A genuinely undated item (no dates at all) and an item whose dates fall entirely outside the chart window used to look identical (both ··). They are now distinguished:

  • undated → ·· (ASCII) / a hatched cell (HTML).
  • off-window earlier → ←· (ASCII) / a ← hint in the first column (HTML).
  • off-window later → ·→ (ASCII) / a → hint in the last column (HTML).

The JSON result reports offWindowCount and undatedCount. Mermaid is unaffected (it always renders real dates).

ASCII TODAY marker

The terminal chart draws a ▼TODAY caret under the week column that contains the current date (parity with the Mermaid %% today: marker and the HTML today column), shown only when "today" falls inside the chart window.

HTML summary & assignee workload

The HTML export ends with a Summary footer — project span (start → end and day count), critical-path length, and total task-days. When exported with --group-by assignee, an additional Assignee workload table lists each assignee's total task-days (descending).

How it works

  • Columns — each column is one calendar week, starting from the Monday of the anchor week (--from, or the current week by default). --to clips the window and derives the week count.
  • Rows — items are grouped by the chosen field; items with no value land in a (no milestone) / (no sprint) / (no release) / (no type) / (unassigned) / (no tag) group. --group-by status groups by lifecycle status.
  • Bars (default) — a bar spans from the item's created_at to its deadline. If only a deadline is known, a one-week bar ending on it is shown. Items with no dates at all are shown as ·· (undated).
  • Bars (--schedule) — a forward pass schedules each item after its registry-defined prerequisites finish. A blocks B and B blocked_by A both put A before B; equivalent inverse rows are deduplicated. Active extension kinds use their declared ordering and precedence. Association, implementation, provenance, temporal, and unknown kinds remain context without ordering work. Duration comes from estimated_minutes (8h workday, rounded up to whole days) or --default-duration. Items with a reachable deadline are back-anchored to end on it. The chain ordering, not the calendar, drives the bars — a late chain can push a dependent past its deadline, which is exactly what a schedule should expose.
  • Critical path — with --critical-path (or --critical-only), the longest chain of dependencies edges is computed (cycle-safe), its items prefixed with * and drawn with ▓▓ bars. Ties break toward the chain with the latest final deadline. --critical-only drops every off-path item.
  • Symbols — ██ = in_progress/blocked, ░░ = open/planned, ▓▓ = critical path, ·· = undated, ←· / ·→ = off-window (dates earlier / later than the window), ‼ OVERDUE = past deadline & not closed.

Item fields used

Items are read via canonical pm list --all --json with bodies, strict source reads, full projection, no truncation, and both universal output bounds set to unbounded. The public pm SDK certifies source, filter, pagination, projection, count, and identity receipts; pm-gantt-chart adds narrow fail-closed checks for unreadable counters and omission/read-output evidence not yet covered by SDK 2026.8.21. A partial or unverifiable workspace read exits non-zero instead of drawing a plausible-looking chart with missing work.

Field Used for
title Row label
status Bar style and status symbol; also used with --status filter
deadline (or legacy due_date) Right edge of the bar; back-anchor target under --schedule
created_at Left edge of the bar (default mode)
estimated_minutes Task duration under --schedule (8h workday)
sprint / release / milestone Group key for --group-by milestone (default), sprint, release
type Group key for --group-by type
assignee Group key for --group-by assignee
status Group key for --group-by status; also bar style
tags[0] Group key for --group-by tag
dependencies[].id (registry ordering: true) Normalized prerequisites used for scheduling, cycles, critical path, slack, and CSV/JSON exports

Development

npm install      # install dev dependencies
npm run build    # build TypeScript → dist/
npm test         # build + run smoke tests
npm run check    # tsc --noEmit
pm install .     # load the built extension locally

Requirements

  • pm-cli >=2026.10.20
  • Node.js >=22.18.0

License

MIT

Release Automation

The repository release gate runs type checking, build, coverage, docstrings, production dependency audit, package packing, and unbounded pm-changelog validation. It also installs the real tarball into fresh npm/npx and Bun/bunx projects on the pinned 2026.10.20 host and into npm/npx on the declared 2026.10.20 minimum, then executes both pm gantt and pm --quiet gantt export --format json against real tracker data. The daily workflow publishes at most once when commits exist after the latest release tag. These technical gates do not override repository-owned privacy or all-source coverage blockers.

Changelog scripts and the release workflow share scripts/pm-changelog.ts. It retains the pinned generator's release selection and validation, then omits only an empty leading Unreleased placeholder. Empty dated releases remain in history, and pending work keeps its Unreleased section. Generation, stdout, step summaries and strict byte comparisons all use the same rendered output. Checks append a requested step summary even when the changelog is stale or missing, while preserving their failure status and leaving the artifact untouched. Output options use the pinned CLI parser: -o and --output accept split or equals forms, and the last option selects the destination for generation and checks.

Multi-agent merge safety

This repo tracks its project management in .agents/pm/ and ships a committed .gitattributes that maps those tracker artifacts to pm-cli's field-aware Git merge drivers, so concurrent-branch tracker edits merge cleanly instead of hard-conflicting. The driver definitions live in per-clone Git config; npm install / npm ci wires them automatically via the prepare script, scripts/prepare-merge-driver.ts: the launcher template pm-ops ships, copied unchanged, which a test compares byte for byte with the pinned template. It runs pm-ops's installer, which calls pm merge install when the pm CLI is on PATH and skips with a notice when it is not. A production install of a clone (npm ci --omit=dev) has no pm-ops, so the launcher skips with one notice, while a stale or broken pm-ops fails the install. Registry installs of this package never run prepare. Being Node-based, it behaves identically on POSIX shells and Windows cmd.exe. To (re)run manually: npm run merge:install.

After merging a branch that touched .agents/pm/, reconcile any residual history-hash drift with pm merge reconcile (pm-cli ≥ 2026.7.22): preview with pm merge reconcile --dry-run, apply with pm merge reconcile --message "post-merge reconcile", then confirm with pm validate, which scans the whole tracker and flags remaining history drift across every affected item (pm merge reconcile itself lists each affected stream in its output; pm history --verify <id> spot-checks one item). The field-aware driver already unions every author's content, so reconcile only re-greens the hash chain (no data loss) — see the authoritative pm-cli merge-safety guide. The older blunt pm history-repair --all remains available as a lower-level primitive.

Triplicate visual identity

Visual exports use build-time values from the exact pm-brand development pin: form paper, carbon ink, ruled item sheets and explicit status fills. Portable font stacks put Archivo, Public Sans and Martian Mono first and fetch no external fonts. Design, themes, token parity and reproducible review renders. The README banner embeds pm-brand's committed output at an immutable SHA.